3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant
| Control System: | Manual/Automatic | Capacity: | 1000kg/h |
| Fuel: | Gas/Diesel/Electricity | Power: | 4-37kw |
| Material: | Stainless Steel/Carbon Steel | Product Name: | Wood Sawdust Dryer |
| Warranty: | 1 Year | Heating Method: | Direct/Indirect |
| High Light: | Carbon Steel Rotary Drum Dryer,Wood Dust Drying Machine 3 t/h,Biomass Plant Dryer 75kw |
||
3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant
3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant Product Description:
3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant Technical Parameters:
| Model | Power (kW) | Capacity (t/h) | Die diameter (mm) | Weight (kg) | Dimension (mm) |
| HGJ1.8x14 | 45 | 2 | - | 10200 | 14000*2400*3600 |
| HGJ2.2x16 | 75 | 3 | - | 13500 | 16000*2600*4000 |
| HGJ2.8x20 | 110 | 5 | - | 21000 | 20000*3200*4600 |
3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant Applications:
- 3 t/h wood dust and fine sawdust drying
- Biomass plants with cost-sensitive specifications
- Sites where bolted flights can be replaced locally
- Drying operations with high fines carry over
3 t/h Carbon Steel Rotary Drum Dryer 75kw Wood Dust Drying Machine For Biomass Plant Why Buy From Jinzhao:
Manufacturing background. Jinzhao has been building pellet machinery in Shandong since 2020, with an in-house machining shop for dies and roller shells rather than outsourcing the wear parts that decide machine life.
What we check before shipment. Every unit runs an empty-load test and a material load test before packing. Die gap, feeder calibration, motor current and pellet density are recorded and sent to the buyer with photos and video, so the machine arrives already proven on material.
After-sales reality. Spare dies, roller shells, bearings and seals are kept in stock for the models we sell. Wear parts are shipped by air within 3-5 days, which is the difference between losing a week of production and losing a month.
Order terms. MOQ 1 set, T/T 30% deposit with balance before shipment, or L/C at sight for larger orders. Delivery is normally 7-15 working days after deposit, packed in export wooden case or container according to machine size.